Suse, Sibylle, Wanda and Käthchen from Baden set a fast pace in Swabia
Federal Chancellor Dr. Angela Merkel in Schwanau
Aircraft take-offs above, tunnel construction below
Successful re-use for Herrenknecht borer in The Hague
In The Hague, a refurbished tunnel boring machine (Mixshield, Ø 11,340 mm) ...
Herrenknecht starts bauma 2019 with coveted Innovation Award
Strong start for the Herrenknecht Group at bauma 2019 in Munich, which ...
Milestone for hard rock tunneling: Final double breakthrough Follo Line
The construction of Norway's longest railway tunnel marked a ...
The future tunnels: Herrenknecht at bauma 2019
The future is forging its way through the underground, where intelligent ...
E-Power Pipe® nominated for bauma Innovation Award 2019
E-Power Pipe® is a trenchless method for the economic and environmentally ...
Get the latest, personalized news right from your inbox. Subscribe to our weekly newsletter.
or