Filters
Go back

Trevi for the new motorway link Port of Oran to the East-West motorway

Port of Oran motorway link to the East-West motorway
TREVI International
Go to photo
Port of Oran motorway link to the East-West motorway

IMAGE SOURCE: TREVI - Finanziaria Industriale S.p.A.

TREVI Algerie, the historic branch of the Trevi Group in Algeria, is engaged, on behalf of the general contractor MIkol and the customer Agence des Autoroutes (ADA), in the foundation works for the new motorway link Port of Oran to the East-West motorway, in north-western area of ​​the North African country.

Port of Oran motorway link to the East-West motorway<br>IMAGE SOURCE: TREVI - Finanziaria Industriale S.p.A.

The project of the motorway junction connecting the port of Oran to the 1st ring road of over 8 km, starts from the extension of the port of Oran, and aims to give access to the already dense traffic, which has significantly increased. The project itself is characterized by major works, viaducts and tunnels. The highway starts at the port of Oran at PK 0 + 600.

Port of Oran motorway link to the East-West motorway<br>IMAGE SOURCE: TREVI - Finanziaria Industriale S.p.A.

Trevi's work consists in the construction of the piers of the viaduct using foundation piles with a diameter of 1200 mm for a maximum depth of 46.50 meters. The piles were made 100% with drilling mud and are equipped with tubes for sonic auscultation.

Port of Oran motorway link to the East-West motorway<br>IMAGE SOURCE: TREVI - Finanziaria Industriale S.p.A.

For these interventions, Trevi Algerie used pile machines, such as the Soilmec SR-45 and Soimec SR-60 and also the Soilmec SC-80 service crane.

Source: TREVI - Finanziaria Industriale S.p.A.