12 September 2025
4.5 years of crane operation at the Grimsel Pass
2: On 3 September 2024, the final con-crete bucket was spectacularly placed into the dam with py-rotechnics and col-oured smoke, mark-ing the end of the approximately six-year construction pe-riod of the new Spit-allamm dam. Read full article