Filters
Go back
4.5 years of crane operation at the Grimsel Pass Europe
IMAGE SOURCE: WOLFFKRAN

4.5 years of crane operation at the Grimsel Pass

2: On 3 September 2024, the final con-crete bucket was spectacularly placed into the dam with py-rotechnics and col-oured smoke, mark-ing the end of the approximately six-year construction pe-riod of the new Spit-allamm dam. Read full article

Wolffkran On LECTURA Specs