Filters
Go back
Assembly in the water: The first crane used for the replacement of the Rader High Bridge was assembled on the new pile cap of the first bridge pier. Europe, Europe
IMAGE SOURCE: Liebherr-Werk Biberach GmbH

Assembly in the water: The first crane used for the replacement of the Rader High Bridge was assembled on the new pile cap of the first bridge pier.

Read full article

Liebherr LR 1250 On LECTURA Specs
Liebherr 150 EC-B 8 Litronic On LECTURA Specs
Liebherr 65 K.1 On LECTURA Specs
Liebherr 81 K.1 On LECTURA Specs