16 March 2026
Handover of the girder bridge to Parabia at the Bawal site
Handover of the girder bridge to Parabia at the Bawal site: Designed for payloads of up to 550 tonnes, the project exemplifies the technological maturity and growing engineering expertise of TII India. Read full article