3 May 2021
Herrenknecht - Brenner Base Tunnel
In July 2020, a Herrenknecht Gripper TBM had completed a 16.63 kilometer long section of the exploratory tunnel on the Austrian north side of the Brenner Base Tunnel. Photo: BBT SE/STRABAG/Jan Hetfleisch Read full article