Filters
Go back
Layer by layer, the areas of quartzite rock between the bored piles are exposed. After lining with steel mesh, shotcrete is applied. The amount of shotcrete used is kept to a minimum. Europe
IMAGE SOURCE: KEMROC Spezialmaschinen GmbH

Layer by layer, the areas of quartzite rock between the bored piles are exposed. After lining with steel mesh, shotcrete is applied. The amount of shotcrete used is kept to a minimum.

Read full article