2 September 2021
Liebherr MK 88 Plus
Super-sized posts: Around 150 posts had to be lifted into the water by the crane in order to assemble stop gates for draining and isolating the barrage. Divers awaited the mighty posts on the riverbed.
Image source: Liebherr-Werk Biberach GmbH
Read full article