12 May 2026
Perfectly planned for efficient lifting operations.
Perfectly planned for efficient lifting operations. BKL positioned the two heavy-duty cranes on opposite banks of the river, with radii of 70 and 80 metres. The cranes thus covered the entire length of the bridge – almost 170 metres – without the need for time-consuming crane reassembling. Read full article