Filters
Go back
Short distances: the new double-curved arch structure is being built directly in front of the existing dam. The different recipes from the SBM mixing systems can be processed immediately using a crane bucket. Europe
IMAGE SOURCE: SBM Mineral Processing GmbH

Short distances: the new double-curved arch structure is being built directly in front of the existing dam. The different recipes from the SBM mixing systems can be processed immediately using a crane bucket.

Read full article

SBM On LECTURA Specs