Filters
Go back
The replacement structure for the eastern half of the bridge is being built next to the existing bridge and is scheduled for completion in 2026. Europe
IMAGE SOURCE: Liebherr-Werk Biberach GmbH

The replacement structure for the eastern half of the bridge is being built next to the existing bridge and is scheduled for completion in 2026.

Read full article

Liebherr LR 1250 On LECTURA Specs
Liebherr 150 EC-B 8 Litronic On LECTURA Specs
Liebherr 65 K.1 On LECTURA Specs
Liebherr 81 K.1 On LECTURA Specs