Filters
Go back
The tunnel is being constructed using the cut-and-cover method, with the bottom plates, walls and slabs being concreted in succession across 54 sections. Europe
IMAGE SOURCE: PERI SE

The tunnel is being constructed using the cut-and-cover method, with the bottom plates, walls and slabs being concreted in succession across 54 sections.

Read full article