Filters
Go back
The two tie-ins, which connect the WOLFF 6031.8 Clear to the building, had to be at tached to columns inside the building and the facade elements built around them. <br> Image source: Rafael Ullrich; WOLFFKRAN press office Europe
IMAGE SOURCE: Rafael Ullrich; WOLFFKRAN press office

The two tie-ins, which connect the WOLFF 6031.8 Clear to the building, had to be at tached to columns inside the building and the facade elements built around them.
Image source: Rafael Ullrich; WOLFFKRAN press office

Read full article

Wolffkran On LECTURA Specs