19 July 2024
WOLFF High Bridge Neckar Valley
Space is at a pre- mium here, which is why the construc- tion site logistics are complex and the cranes had to be assembled in two stages. As construction pro- gresses, one of the two WOLFF 7534.16 Clear cra- nes will be relo- cated again. Read full article