28 August 2024
Wolffkran Austria deploys powerhouse for reservoir clean-up
The reservoir had accumulated a layer of sediment several meters thick, which was removed by an excavator. The WOLFF 8060.25 Cross transported the crane troughs with up to 18 tons of sediment to the deposit area. Read full article