Filters
Go back
Working almost 70 m up: the contractor used machines and digital solutions from Vögele to pave the surface course of the Aftetal Bridge. Europe
IMAGE SOURCE: WIRTGEN GROUP

Working almost 70 m up: the contractor used machines and digital solutions from Vögele to pave the surface course of the Aftetal Bridge.

Read full article

Vögele On LECTURA Specs
Wirtgen On LECTURA Specs