Filters
Go back

Demag AC 500-8 lifts chimney liner at Munich cogeneration plant

With this job, literally every centimeter counted: On behalf of Munich City Utilities, AKM Autokranvermietung lifted a chimney liner weighing 19 t into the existing chimney of a cogeneration plant in the Freimann district of Munich. With a required lifting height of 119 m, crane operator Klaus Kellner fully exploited the allowable capacity of his Demag® AC 500-8 crane. Read full article

Demag AC 500-8 On LECTURA Specs

Sponsors