PERI NEWS


PERI

PERI UP for an architectural highlight ”Down Under“

n Melbourne, the continent´s largest shopping centre has been renovated and expanded. Now an architecturally demanding, curved glass construction covers the Chadstone Shopping Centre which was opened in 1960.

read more...

PERI Formwork Carriage follows the world´s largest tunnel boring machine

The 1950s vintage Alaskan Way Viaduct has long been considered one of the most important thoroughfares along Seattle's waterfront. As a replacement for the elevated viaduct that is used daily by 110,000 vehicles,...

Well equipped and heated through the winter

The preservation of cultural monuments such as Neuschwanstein Castle is usually associated with a great deal of time and effort together with correspondingly higher challenges placed on the erection of the scaffold.

PERI DUO continues to garner additional awards

PERI presented the PERI DUO Universal Formwork to the international public for the first time at bauma 2016 in Munich. Already at its premiere, the response of industry professionals was incredibly positive.



Practical applications for BIM

PERI is currently planning the formwork and scaffolding solution for the construction of the Filstal Bridge on the Wendlingen-Ulm rail connection. This bridge was defined by the Federal Ministry...

From planning to implementation

Enhanced safety along with maximum flexibility: the new PERI UP Easy* facade scaffold system solves two of the most important challenges faced in day-to-day construction site operations...

Innovative Systems for craft producers – Competence in project solutions for planners

What can one of the largest internationally operating suppliers of scaffolding and formwork systems possibly offer smaller construction companies, tradesman or municipal building enterprises?

Targeting worldwide growth

PERI can look back with great satisfaction at events in 2016 and retains a positive outlook regarding future business development. Special highlights of the year included participation...

Landmark Mersey Gateway on form with help from PERI

Supported by three pylons, the six lane bridge will be 2,130 m long and will provide considerable traffic relief to the existing and over-used crossing – the Silver Jubilee Bridge.

Warmly wrapped up in winter: extended pouring times at sub-zero temperatures

Around 30 km to the north of Helsinki, the so-called Domino Complex is currently being realized – for the construction company,...