12 September 2025
4.5 years of crane operation at the Grimsel Pass
The dismantling took place in two stages. In fall of 2024, the upper, narrower tow-er of the first WOLFF was dismantled. This summer, the lower tower and the com-plete second crane followed. Altogeth-er, the dismantling with a 650-ton mobile crane took around three and a half weeks. Read full article