3 August 2023
A well-rounded affair
At the Kassel sewage treatment plant, rainwater overflow basins are being replaced. Schnittger cut through the huge, ring-shaped rim of the basin with a KEMROC DMW 220 cutter wheel on a 40-tonne excavator. Read full article