Filters
Go back
Removing concrete from the central pier. The upper section remained untouched while a 1.6 m deep layer was removed from the lower section. Europe
IMAGE SOURCE: KEMROC Spezialmaschinen GmbH

Removing concrete from the central pier. The upper section remained untouched while a 1.6 m deep layer was removed from the lower section.

Read full article