Filters
Go back
The crane operators unload the turbine from the barge in Oberhausen and slew the heavy load between the two cranes. Europe
IMAGE SOURCE: Liebherr-Werk Ehingen GmbH

The crane operators unload the turbine from the barge in Oberhausen and slew the heavy load between the two cranes.

Read full article

Liebherr LTM 1450-8.1  On LECTURA Specs